| Client: Oakbraid Ltd/ Main Contractor: Miller Construction/ Frame Contractor: Dunne / Design Engineer: Blyth & Blyth | Westport House, Edinburgh |
|
ConForce provided valuable design input at the initial stage, giving detailed data for post tensioned slabs on all the upper floors, levels 1-6. This at first appeared to be a simple rectangular building using 250mm thick P.T. slabs on a 9.0 x 7.5m column grid. It soon developed however, into a very complex design requiring local thickenings for long spans, complex perimeter shapes, further complicated by a lack of stressing access. Finally a major co-ordination exercise with the stone cladding subcontractor was carried out to ensure that their fixings were clear of the post tensioning anchorages. The components and methods used were of bonded post tensioning with 4 and 5 strand 13mm tendons in 75 x 20mm ducts; 2 pours per floor with in infill strip in RC at mid – length of the floor. Shear rails were used for the first time on a ConForce project and this in addition to the post tensioning overall significantly reduced site fixing time on each pour. We are very pleased to have been involved with this complex and interesting project that when completed will be a prominent commercial building in the city adding to our ever expanding portfolio of successfully completed projects in Edinburgh. |
![]() |
Conforce Ltd, Head Office: Inchmuir Road, Whitehill Industrial Estate, Bathgate,
EH48 2EW Phone: +44 (0)1506 657798 Fax: +44 (0)1506 657770 |
Regional Office: 4205 Park Approach, Thorpe Park, Leeds LS15 8GB Phone: +44 (0)1132 840544 Fax: +44 (0)1132 840541 |
©2012 Conforce Ltd All Rights Reserved |