Projects |
|
|
| Client: East Thames Group / Main Contractor: Lancsville / Frame Contractor: Lancsville / Design Engineer: Walsh Group | 160-188 Stratford High St, London |
|
The 160-188 Stratford High Street Development in East London is a 26 storey residential development with two lower levels of retail space. ConForce Ltd was awarded the installation and stressing of the post-tensioning to the suspended slabs by Lancsville Constructions. The design of the slabs was carried out by Walsh Associates using un-bonded post-tensioning techniques, where individual strands are housed inside a plastic coated greased sheath. No grouting of the individual strands takes place and hence the strands are “live” throughout the course of the structures life. With a total suspended floor slab area of approximately 30,000m2 and a height of 26 storeys, the Stratford High Street Development is one of the tallest residential developments in London. |
![]() |
Conforce Ltd, Head Office: Inchmuir Road, Whitehill Industrial Estate, Bathgate,
EH48 2EW Phone: +44 (0)1506 657798 Fax: +44 (0)1506 657770 |
Regional Office: 4205 Park Approach, Thorpe Park, Leeds LS15 8GB Phone: +44 (0)1132 840544 Fax: +44 (0)1132 840541 |
©2012 Conforce Ltd All Rights Reserved |