Projects |
|
|
| Client: Peel Holdings / Main Contractor: Bovis Lend Lease / Frame Contractor: Byrne Bros / Design Engineer: Capita Symonds | St Anne Hotel, Gloucester Quays |
|
After many stages of negotiation and design development, we have been awarded the subcontract by Byrne Bros to supply the complete post tensioning package to 4 floors of this prestigious new hotel development. This includes the 1st floor which has beams containing MK4 Multistrand tendons type 12/15. These beams take the loads back to the few columns from ground to 1st floor thereby giving a more open floor area at ground level as required by the client. The floor plate at 1st floor is very complex having an irregular perimeter, incorporating a link slab to the adjacent car park and being on a gradual curve as well as dealing with loadings being transferred from the upper floors. ConForce are delighted to be working alongside Byrne Bros once more on this complex and interesting project which demonstrates our ability to deliver designs and bespoke systems as required for this “one-off” type of project. |
![]() |
Conforce Ltd, Head Office: Inchmuir Road, Whitehill Industrial Estate, Bathgate,
EH48 2EW Phone: +44 (0)1506 657798 Fax: +44 (0)1506 657770 |
Regional Office: 4205 Park Approach, Thorpe Park, Leeds LS15 8GB Phone: +44 (0)1132 840544 Fax: +44 (0)1132 840541 |
©2012 Conforce Ltd All Rights Reserved |