Projects |
|
|
| Client: Grosvenor/AMA / Main Contractor: HBG / Frame Contractor: Dunne / Design Engineer: Goodson Associates | Fountainbridge, Edinburgh |
|
The development at Fountainbridge North Springside, near the city centre in Edinburgh comprises of various residential buildings up to 6 levels built off a podium and totalling 6500m² of post tensioned slabs. The awarded contract includes the design supply and install of the post tensioning system to a total of 14 slabs in buildings A2, B3, B1 and C1. The slabs are of various spans up to 8.4m and the floor plate shapes also vary but the post tensioned slab depths were standardised at an early stage of scheme design at 260mm. This is the first phase in a large development which it is hoped will bring further similar work on this site in due course.
|
![]() |
Conforce Ltd, Head Office: Inchmuir Road, Whitehill Industrial Estate, Bathgate,
EH48 2EW Phone: +44 (0)1506 657798 Fax: +44 (0)1506 657770 |
Regional Office: 4205 Park Approach, Thorpe Park, Leeds LS15 8GB Phone: +44 (0)1132 840544 Fax: +44 (0)1132 840541 |
©2012 Conforce Ltd All Rights Reserved |