Projects |
|
|
| Client: Westmark / Main Contractor: Sir Robert McAlpine / Frame Contractor: John Cooper Construction / Design Engineer: ARUP | Cabot House, Bristol |
|
ConForce were very pleased to be awarded this contract by John Cooper Construction in December 2008 for the supply, installation, stressing, and grouting of tendons on this site. The project includes office and residential accommodation and is located at a prime site near to Harbourside and the city centre. ConForce are supplying and installing the post tensioning system to a total of 7500m² of slabs on 5 floors; the design calculations and drawings of the post tensioned slabs are by Arup (Bristol office). The slabs are 275mm thick and all tendons are 4/13 bonded. The detailed requirements of the Arup Specification and the CARES QA procedures have been addressed using a combination of experienced site staff and proven materials and methods including the use of premixed Cable Grout by TECROC. This product gives all parties assurances regarding the various properties required of the grout. ConForce started on site in March 2009 with a planned duration of approximately 4 months. This project demonstrates our continued presence on major contracts in Southern England working alongside key UK Contractors and Engineers. |
![]() |
Conforce Ltd, Head Office: Inchmuir Road, Whitehill Industrial Estate, Bathgate,
EH48 2EW Phone: +44 (0)1506 657798 Fax: +44 (0)1506 657770 |
Regional Office: 4205 Park Approach, Thorpe Park, Leeds LS15 8GB Phone: +44 (0)1132 840544 Fax: +44 (0)1132 840541 |
©2012 Conforce Ltd All Rights Reserved |